Water Board Basin of Lake Tanganyika |
AJIRA TANZANIA 2020 / NAFASI ZA KAZI 2020
Overview
Water service was introduced since the colonial era in the 1930s. Construction of village water projects began in the late 1950s and was carried out in all nine provinces of the time.
Water service was introduced since the colonial era in the 1930s. Construction of village water projects began in the late 1950s and was carried out in all nine provinces of the time.
Recommended:
Download Your National ID (NIDA) Here | Download NAMBA NA KITAMBULISHO CHAKO CHA NIDA. BONYEZA HAPA!
Water service delivery plans were compiled to meet the needs of the Colonial Government and the service was not provided with policy directives.
Recommended:
In 1961 the Department of Water and Irrigation was under the Ministry of Agriculture, whose job it was to provide rural water for human and livestock; water resource management and flood prevention; implement irrigation projects and conduct hydrological investigations and develop long term plans to develop water projects.
Recommended:
DOWNLOAD PDF FILE HERE!